Yes, a sanatoria abusi edilizi is possible, but only under one condition: the work must satisfy doppia conformità, meaning it complied with planning rules both when built and today, or it falls under the narrower Salva Casa exceptions for minor discrepancies. Before anything else, hire a tecnico to pull the property’s full file from the Comune and freeze any ongoing construction until you know what you are actually dealing with.
TL;DR:
- Sanatoria abusi edilizi only qualifies if work meets doppia conformità, meaning it complies with planning rules at both construction and current times.
- The process involves different procedures depending on the violation’s severity, with Article 36 offering a stricter 60-day decision window and Article 36-bis providing a 45-day window with automatic approval if no objection arises.
- Eligibility is often blocked by landscape or heritage constraints, unauthorized volume increases, or changes of use that violate zoning laws.
- Costs include a sanction calculated as double the normal contribution or based on the property’s market value increase, typically ranging from €516 to €10,328.
- Precise legal and technical reconstruction before buying is crucial, as it provides leverage and prevents surprises during property negotiations.
Table of Contents
- What Sanatoria Abusi Edilizi Actually Means
- Who Actually Qualifies: The Doppia Conformità Test
- Two Paths, Two Clocks: Art. 36 vs. Art. 36-bis
- What Sanatoria Actually Costs
- How to File a Sanatoria: Step by Step
- When Sanatoria Isn’t an Option
- What Buyers and Sellers Should Check Before Signing Anything
- Why Early Technical Reconstruction Changes Everything
- How Living Italy Handles Sanatoria Risk for Buyers
- Sources
- FAQ
What Sanatoria Abusi Edilizi Actually Means
A sanatoria abusi edilizi is not an amnesty. It is a legal procedure, formally called accertamento di conformità, that lets an owner ask the Comune to retroactively authorize work that was built without a permit or that deviated from one. That distinction trips up a lot of foreign buyers who hear “sanatoria” and assume it works like the old condoni of 1985, 1994, and 2003, which forgave abuses regardless of whether they matched planning rules at the time.
Today’s mechanism is narrower and stricter. Under Article 36 of DPR 380/2001, the Testo Unico dell’Edilizia, the Comune can only grant a permesso in sanatoria if the work respects both the urban planning rules in force when it was built and the rules in force now. Get either one wrong and the request is denied by law, not by discretion.
The application goes through the Sportello Unico per l’Edilizia (SUE), the municipal office that handles every building title in Italy. Procedures, required forms, and even how quickly staff process files vary from one Comune to the next. A file that moves in eight weeks in a small hill town might sit for months in a larger city with a backlogged planning office, so local practice matters as much as the national law.
Who Actually Qualifies: The Doppia Conformità Test
Doppia conformità is the gatekeeper for the entire process. It asks two separate questions: was the structure legal under the zoning and building code the day it was completed, and is it legal under today’s code? A “yes” to only one of those questions means the sanatoria fails, no matter how minor the violation looks on paper.
Several factors routinely block approval:
- Landscape or heritage constraints (vincoli paesaggistici or vincoli culturali). If the property sits in a protected zone, the SUE must involve the Soprintendenza, and a missing or unfavorable opinion can stall or sink the request. A guide to Italian landscape restrictions breaks down how these constraints interact with sanatoria applications.
- Increases in volume or footprint beyond what local zoning allows for that lot, even a modest extension that pushes past the index.
- Unauthorized change of use (destinazione d’uso), such as converting a garage into livable space without updating the cadastral and planning classification.
There are exceptions worth knowing. Structures built before September 1, 1967, generally predate the modern permit regime and are judged under different, often more forgiving, criteria. Modest difformità, small deviations from an approved plan that don’t touch volume, height, or setbacks, may now qualify for streamlined treatment under Salva Casa rather than a full accertamento di conformità. And because municipal planning instruments differ by region and even by comune, the same physical discrepancy can be sanable in one town and not in the next.
Two Paths, Two Clocks: Art. 36 vs. Art. 36-bis
Once eligibility looks plausible, the choice of procedure decides how long you wait and how much uncertainty you carry.
Permesso in sanatoria under Article 36 is the traditional route, used for more substantial abuses that required a full building permit in the first place. The Comune has 60 days to decide, and if it says nothing, the law treats that silence as a rejection, known as silenzio-rigetto. That single rule catches a lot of applicants off guard: in most Italian administrative procedures, silence favors the citizen. Here it does the opposite, so a stalled file is not a win, it is a denial you have to appeal or refile.
SCIA in sanatoria under Article 36-bis, introduced by the DL Salva Casa reform of May 29, 2024, covers lighter cases, typically partial difformità that would have needed only a SCIA rather than a full permit. Here the logic flips: the Comune has 45 days, and if it doesn’t object, silenzio-assenso kicks in, meaning silence equals approval. That is a meaningfully friendlier clock than Article 36, which is part of why Salva Casa has become the preferred route wherever the violation qualifies. A breakdown of SCIA versus CILA explains how these lighter permit categories work in ordinary construction, which helps make sense of why 36-bis borrows the same logic.
Both timelines assume a straightforward file. When the property carries a vincolo, the SUE has to forward the request to the Region or the Soprintendenza for a parere, and that step runs on its own schedule, often extending the overall wait well past the nominal 60 or 45 days. The MIT’s implementation guidelines for Salva Casa are explicit that this is a targeted simplification, not a blanket amnesty, and that compatibility with landscape and heritage rules remains a separate, decisive check regardless of which article applies.
One efficiency worth knowing about: when a property needs both a change of use and a sanatoria, some municipalities now allow a procedimento a finalità multipla, combining both requests into a single filing instead of running two separate procedures back to back. It’s not universal, but where it’s available, it can shave real time off the process.

What Sanatoria Actually Costs
Regularizing a building abuse is never free, and the fee structure differs depending on which procedure applies.
Under Article 36, the oblazione is calculated as double the contributo di costruzione that would have applied had the permit been requested normally, essentially, the fee you would have paid up front, doubled as a penalty for building first and asking later. Under Article 36-bis, the sanction ties instead to the increase in market value (aumento del valore venale) that the unauthorized work added to the property, which can land higher or lower than the doubled-contribution formula depending on the local market.
Practical sanction ranges cited by building-industry guides run roughly from €516 to €10,328 for many standard cases, though the exact figure depends on the specific violation, the comune’s own fee schedule, and whether corrective work is also required. On top of the oblazione, budget for the tecnico’s fees for surveys and drawings, cadastral update costs, and, if the Comune requires partial corrective work before it will approve the file, the cost of that construction itself.
How to File a Sanatoria: Step by Step
Filing without the right paperwork is the single most common reason a request drags on for months longer than it should.
- Reconstruct the building’s legal history first. Request accesso agli atti at the Comune to pull every deposited title, prior condono, and approved plan tied to the property. Skipping this step and relying on the seller’s word or a cadastral printout is the most frequent, and most expensive, mistake buyers and owners make.
- Commission an as-built survey. A licensed tecnico produces current planimetrie and compares them against what was originally authorized, creating a grafico confrontato that shows exactly where the discrepancy lies.
- Prepare the relazione asseverata. This sworn technical report, signed by the tecnico abilitato, states that doppia conformità is met and lays out the legal basis for the request. The tecnico takes on personal professional liability for this declaration, which is why it has to be accurate, not optimistic.
- Gather supporting documents. Photos, cadastral records, any prior condono paperwork, and proof of the original title (or its absence) all go into the file.
- File with the SUE, choosing Article 36 or 36-bis based on the nature of the violation.
- Respond promptly to any richiesta di integrazioni. If the Comune asks for more documentation mid-review, the clock on your decision term generally pauses until you supply it, so delays here extend your total wait.
- Pay the oblazione once the technical review is favorable, and wait for formal notification, or for silenzio-assenso to run its course under 36-bis.
When Sanatoria Isn’t an Option
Some abuses simply cannot be regularized, no matter how good the paperwork looks. Structures that exceed the planning index for the lot, that sit entirely outside the buildable footprint, or that changed use in a way the zoning forbids (turning agricultural land into a residential unit, for instance) fail the doppia conformità test outright, since no version of today’s rules would have allowed them either.
When a sanatoria is denied or was never viable, the Comune can issue an ordine di demolizione, a formal demolition order, alongside administrative sanctions. In some cases, owners can negotiate a ripristino, a restoration to the prior legal state, as an alternative to full demolition, particularly when only part of the structure is the problem. Owners facing a rejection also have the right to an administrative appeal, though that path adds time and legal cost without any guarantee of a different outcome. At that point, professional guidance stops being optional and becomes the only way to avoid compounding the loss.
What Buyers and Sellers Should Check Before Signing Anything
A cadastral planimetry is not proof that a property is legal. It only shows what’s been declared for tax purposes, and Italy has plenty of properties whose cadastral records and actual urbanistic status diverge sharply. The only way to know the real picture is to pull the Comune’s own file and map the stato legittimo against what physically exists on site, a process Living Italy’s guide to verifying conformità urbanistica walks through in detail.
If a known irregularity turns up during due diligence, the purchase contract needs to allocate that risk explicitly, not assume it will sort itself out after closing.
- Insist on a condizione sospensiva (condition precedent) tied to a successful sanatoria outcome, or to an agreed remediation plan and timeline.
- Specify in writing who pays the oblazione and any corrective works, buyer or seller, and by when.
- Never assume a pending sanatoria will be approved. A new owner inherits the administrative situation as it stands, sanctions and demolition risk included.
- For any property near a coastline, historic center, or protected landscape, budget extra time for Soprintendenza review before you set a closing date.
Pro Tip: Order the accesso agli atti before you make an offer, not after. Reconstructing a building’s legal history takes weeks even when the file is clean, and finding out mid-negotiation that it isn’t gives you far more leverage than finding out after you’ve signed a preliminary contract.
Why Early Technical Reconstruction Changes Everything
The biggest risk in a sanatoria isn’t the paperwork, it’s timing. Buyers who reconstruct a property’s legal history before making an offer walk into negotiations with leverage; buyers who discover an abuse mid-transaction are negotiating from a position of exposure, often against a seller who has every incentive to downplay the issue.
A coordinated team matters more than most people expect. A tecnico can tell you whether doppia conformità is realistic. A lawyer can tell you how to structure the contract around that uncertainty. A tax advisor can tell you what an unresolved sanatoria does to future resale value. Handling these separately, or sequentially, is how costs and delays compound. Handling them together, before the preliminary contract is signed, is how they don’t.
— MG
How Living Italy Handles Sanatoria Risk for Buyers
Living Italy exists for exactly this moment, when a property looks right but its paperwork raises questions you can’t answer alone. Unlike an agency working for the seller, Living Italy represents only the buyer, which means the incentive is to find every irregularity before you sign, not to smooth them over to close the deal.

The Property Finding & Buyer Advisory service coordinates the technical, legal, and cadastral checks described throughout this guide, so you get one team reconstructing the building’s history instead of three specialists working in isolation. For properties where an abuse is confirmed and needs a real fix, Restoration & Project Management handles the corrective works and permitting that follow a sanatoria approval. And where the legal picture is genuinely murky, Full Legal Due Diligence digs into title history, municipal files, and constraint checks before you’re financially committed.
To start, request a consultation and bring what you already have: the property’s title documents, the cadastral plan, and any municipal notices or correspondence tied to the building. That’s usually enough for a first read on whether a sanatoria is realistic and what it will cost you.
Sources
This article is general information, not a substitute for advice from a qualified lawyer. Consult a qualified legal professional about your own circumstances before acting on anything here.
FAQ
Can You Sanare a Building Abuse After 20 Years?
Age alone doesn’t disqualify a violation. What matters is whether the structure meets doppia conformità_Accertamento_di_conformit%C3%A0/7342), legal under the rules in force when built and under today’s rules. An abuse that never matched either set of rules is just as insanable as one built last year.
What Are the Sanatoria Timelines?
Article 36 permesso in sanatoria requests get a 60-day decision window, with silence counting as rejection. Article 36-bis SCIA in sanatoria requests, introduced by the DL Salva Casa reform, run on a 45-day window where silence counts as approval. Properties with landscape or heritage constraints take longer, since the SUE must wait on a parere from the Soprintendenza.
How Do You Regularize Old Building Abuses?
Start by pulling the property’s full file from the Comune rather than trusting cadastral records alone. A licensed tecnico then compares the as-built condition to what was authorized, prepares a relazione asseverata confirming doppia conformità, and files either an Article 36 or Article 36-bis request through the SUE.
How Much Does It Cost to Sanare an Old Building Abuse?
The oblazione for Article 36 cases is calculated as double the contributo di costruzione that would have applied to a normal permit. For 36-bis cases it’s tied to the increase in market value the unauthorized work created. Practical sanction figures typically fall between roughly €516 and €10,328, on top of technical and cadastral fees.
Recommended
- Buyers in Italy: Order an RTI to Verify Conformità Urbanistica
- Property restoration project management Italy
- Agibilità Immobile: 4 Checks Buyers Must Do Before They Sign
- CILA or SCIA in Italy? The Rule That Decides Your Permit
The information provided here is general in nature and does not replace professional assistance. Reading this content does not create a professional-client relationship.